1. The problem of paste surface treatment; a layer of rust will appear on the metal surface after long-term use. Before paste, it needs to be polished and derusted by sandblasting and polishing machine.
2. Pay attention to problems before construction; workers will inevitably leave oil or dust on the metal surface during grinding and polishing. If they are not cleaned with special cleaning agent again, they will be directly pasted, which will cause the ceramic sheet to be not firmly attached and fall off.
3. Pay attention to the problems during construction; the ceramic glue provided should be strictly prepared according to the proportion requirements, and the ingredients should be mixed evenly with each other. The ambient temperature is controlled between 5 and 40°C, and construction under direct sunlight and strong wind should also be avoided to prevent the ceramic sheets from being squeezed and deformed due to the thermal expansion and contraction effect of the ceramic sheets, and the strong wind will seriously affect the ceramic glue due to dust.
4. Inspection and maintenance after construction; check whether the surface of the ceramic sheet is smooth and flat, and whether there is cracking. If there is, it should be repaired in time. The pasted and flat ceramic sheet needs to be cured for 24 hours before it can be put into use.